Under 20% Plagarism only. WILL NEED TO INCLUDE TURNITIN REPORT ASAP
InstructionsAs a project manager,keep it simple. You are considering using either the risk driver method of project cost risk analysis or the traditional 3-point cost analysis on your latest project.Write a paper with a minimum of 8 pages comparing and contrasting the steps of the traditional 3-point cost analysis method and the risk driver method.provide a specific example that determines total project cost with 4 cost elements using the 3-point cost analysis method.Show each step of the process and the associated tables to depict the data.Your paper should do the following:Fully define and describe the steps of the risk driver method and the 3-point method.Compare and contrast each method giving pros and cons.Develop sample project cost estimates using a spreadsheet as well as discuss contingencies.Include a table with the following data to support your example:Project cost element table with associated 3-point estimates, mean, and variances.Total project standard deviation and total project mean.Discuss how to prioritize risks to cost, risk mitigation and schedule.Cumulative probability distribution (10%-90%) table for the total project cost.